Prefab Steel Building - Heavy Engineering Structure - Pre Engineered Building - Factory Shade - Workshop Unit - Warehouse Solution - Fuel Station - Cold Storage - Multistory Building Or Any High Rise Building

Build matt is Uganda’s leading manufacturer of high quality Pre-engineered building, Started in 2001, located at 5th Street, Industrial area, Kampala, Uganda.

Our Pre-engineered buildings are suitable for both, industrial as well as commercial operations such as Steel frame Building, Warehouses, factories shade, workshop unit, aircraft hangars, cold storage, stadiums, Poetry farm Fuel station supermarkets or any high-rise building.

Our clients range from the smallest to the largest firms in and around the east Africa region like Uganda, South, Sudan, Rwanda, Burundi, Congo & Kenya as well.

Pre-Engineered Buildings

Pre-Engineered Building

Our pre-engineered building system is unmatched in its speed and value. Buildings to suit specific needs, are designed, engineered, manufactured and delivered in less than 8 weeks and at a cost that is as low as 20 percent of the cost of conventional steel buildings.

Our Pre Fab building is suitable for both, industrial as well as commercial operations such as Steel frame Building, Prefab Warehouse, factories shade, workshop unit, aircraft hangars, cold storage, stadiums, Paoultry farm shade, Fuel station, roof work, supermarkets or any high-rise building.

Clear Spans Up To 95 Meters Wide And Eave Heights As High As 40 Meters Are Possible.

The pre-engineered building system is, without doubt, one of the fastest growing building systems in the world.

The advantages that it offers appeal to all parties inolved in the project. After all, who can resist a builsing system that offers speed, quality and value.

Applications of pre-engineered building are numerous. Described buildings are ideal for any residential & non-residential low-rise building.

From plannning to occupancy, nothing matches Arcedges Steel's Pre-Engineered Building System in terms of versatility, flexibility and total value-engineering.

Why Build Matt Ltd for Pre Fab Building (PEB)?

We have equipped ourselves with the best machineries having international standards and we make world class PEBs that serves the best quality and cost effectiveness.

Our pre-engineered building system is unmatched in its speed and value. Buildings, to suit specific needs, are delivered in less than 8 weeks and at a cost that is as low as 20 percent of the cost of conventional steel building

year warranty for water-leak, 3-year material warranty, and 10-year structural warranty.

We belive in 'Kaizen' Japanese philoshopy of continuous improvement in all aspects.

we endecor to create an environment where innovation is encouraged and highly moticated employyees actively participate in work and freely ecpress their ideas.

Prefab commercial building, Prefab industrial building, Prefab Cold Storage, Prefab high rise buildings, Prefab aircraft hangars

PEB Quality Assurance

Schedule control procedures at ABIL are critical in achieving success for the client and ABIL These procedures establish project safety, cost, schedule and quality plans. During project execution, the status of the project is periodically evaluated to identify deviations from these plans. Management can then identify the actions or adjustments that may be necessary to keep the overall project on target.

Our schedules are tracked by comparing actual progress to the baseline control plan. It's basically a balance between work sequencing and manpower allocation that allows us to accomplish desired work progress.

OUR PROCESS FOR CONTROLLING SCHEDULE IS THE FOLLOWING:

1

Quality Assurance for Prefab home, Welding, Metal work, Steel Company, Hangar, Roofing work, Wall Cladding

CNC Plasma Cutter

At project initiation, the baseline control schedule is developed. This is the reference document for planning & is modified only as a result of Owner approved change orders.

The design of the schedule is such that it is realistic & a positive planning tool & facilitates the roll up of gross details into successively larger categories.

Weekly working schedules are prepared which updates of the control schedule are to reject progress to date. During preparation of the weekly work schedule, variations from the control schedule are accessed & adjustments & actions to steer progress towards the established milestones are implemented. In all cases, the working schedule is planned to keep the project as close to the control schedule as possible.

Quality Assurance for Fiber sheet, Pergola, Car shade, Carport, Awnings, Pertol station shade, Prefab Craft Hangars

Press Brake

2

3

Quality Assurance for warehouse work, Steel Structurer, Aluminium Clading, Aluminium doors and windows, Canopy

Rolling Machine

Pre-engineered building. The baseline control schedule is revised when change orders that affect schedule is received.

The end result achieves, on time delivery and on time project completion which is the ultimate goal for quality.