The fabrication process included structural steel cutting, bending, railing fabrication, and ATC component preparation.
1
Entire structure was fabricated in-house under strict quality control to ensure international standards were met.
2
Each part was labeled and pre-drilled to simplify on-site identification and minimize errors during assembly.
3
Components were carefully packaged to ensure damage-free transport from Uganda to Juba, South Sudan.
4
The client successfully erected the structure using detailed guidance, without needing specialist tools or rework.
5